RESIDENTIAL/GOVERNMENT

Meter SizeMinimum Charge
First 10 cu.m.
11-20 cu.m.21-30 cu.m.31-40 cu.m.41+ cu.m.
1/2″280.0029.9032.7036.4041.40
3/4″448.0029.9032.7036.4041.40
1″898.0029.9032.7036.4041.40
1 1/2″2,240.0029.9032.7036.4041.40
2″5,600.0029.9032.7036.4041.40
3″10,080.0029.9032.7036.4041.40
4″20,160.0029.9032.7036.4041.40

COMMERCIAL/INDUSTRIAL

Meter SizeMinimum Charge
First 10 cu.m.
11-20 cu.m.21-30 cu.m.31-40 cu.m.41+ cu.m.
1/2″560.0059.8065.4072.8082.80
3/4″896.0059.8065.4072.8082.80
1″1,792.0059.8065.4072.8082.80
1 1/2″4,480.0059.8065.4072.8082.80
2″11,200.0059.8065.4072.8082.80
3″20,160.0059.8065.4072.8082.80
4″40,320.0059.8065.4072.8082.80

COMMERCIAL A

Meter SizeMinimum Charge
First 10 cu.m.
11-20 cu.m.21-30 cu.m.31-40 cu.m.41+ cu.m.
1/2″490.00
3/4″784.0052.3057.2063.7071.90
1″1,568.0052.3057.2063.7071.90
1 1/2″3,920.0052.3057.2063.7071.90
2″9,800.0052.3057.2063.7071.90
3″17,640.0052.3057.2063.7071.90
4″35,280.0052.3057.2063.7071.90

COMMERCIAL B

Meter SizeMinimum Charge
First 10 cu.m.
11-20 cu.m.21-30 cu.m.31-40 cu.m.41+ cu.m.
1/2″420.0044.8549.0554.6061.65
3/4″672.0044.8549.0554.6061.65
1″1,344.0044.8549.0554.6061.65
1 1/2″3,360.0044.8549.0554.6061.65
2″8,400.0044.8549.0554.6061.65
3″15,120.0044.8549.0554.6061.65
4″30,240.0044.8549.0554.6061.65

COMMERCIAL C

Meter SizeMinimum Charge
First 10 cu.m.
11-20 cu.m.21-30 cu.m.31-40 cu.m.41+ cu.m.
1/2″350.0037.3540.8545.5051.35
3/4″560.0037.3540.8545.5051.35
1″1,120.0037.3540.8545.5051.35
1 1/2″2,800.0037.3540.8545.5051.35
2″7,000.0037.3540.8545.5051.35
3″12,600.0037.3540.8545.5051.35
4″25,200.0037.3540.8545.5051.35

BULK/WHOLESALE

Meter SizeMinimum Charge
First 10 cu.m.
11-20 cu.m.21-30 cu.m.31-40 cu.m.41+ cu.m.
1/2″840.0089.7098.10109.20123.20
3/4″840.0089.7098.10109.20123.20
1″840.0089.7098.10109.20123.20
1 1/2″840.0089.7098.10109.20123.20
2″840.0089.7098.10109.20123.20
3″840.0089.7098.10109.20123.20
4″840.0089.7098.10109.20123.20
Delivery Charge – Php 1,478.00 (10 cu.m. and 14 cu.m. tanker) and Php 957.00 (2 cu.m. tanker) within 10-kilometer from source with additional charge of Php 24.00/kilometer for every succeeding kilometer.

The collection of the septage fee is Php 2.00/cu.m. of actual consumed water on top of the water rates.

For more information, read our Utility Rules here: https://ppcwater.gov.ph/about-us/utility-rules/